MS Project ODBC Driver

Read, Write, and Update Microsoft Project through ODBC

Easily connect live Microsoft Project data with BI, ETL, Reporting, & Custom Apps.


  download   buy now


Other Technologies


Microsoft Project Logo

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity. Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.

Features

  • Fully compatible with Microsoft Project Web Apps and Microsoft Project on Office 365
  • SQL-like access to your MS Project data, including custom fields
  • Powerful metadata querying enables SQL-like access to non-database sources
  • Push down query optimization pushes SQL operations down to the server whenever possible, increasing performance
  • Client-side query execution engine, supports SQL-92 operations that are not available server-side
  • Connect to live Microsoft Project data, for real-time data access
  • Full support for data aggregation and complex JOINs in SQL queries
  • Secure connectivity through modern cryptography, including TLS 1.2, SHA-256, ECC, etc.
  • Seamless integration with leading BI, reporting, and ETL tools and with custom applications

Specifications

  • Supports 32-bit and 64-bit applications.
  • ODBC 3.8 compliant native protocol based drivers.
  • Comprehensive ANSI SQL-92 support.
  • Full Unicode Support - any language, any data.
  • Cross-platform ODBC. Available for Windows, Linux and macOS.

Windows
macOS
Unix

AVAILABLE IN:
ODBC DESKTOP SUBSCRIPTIONS
200+ ODBC Drivers For Real-Time BI & Reporting.
LEARN MORE

Where can I use the MS Project ODBC Driver?

Robust ODBC Access to Microsoft Project

Full-featured and consistent SQL access to any supported data source through ODBC


  • Standards-Compliant ODBC

    ODBC 3.8 compliant native protocol based drivers.

  • Unicode, 32-bit and 64-bit support

    Support 32-bit and 64-bit applications and unicode ODBC APIs.

  • Cross-platform ODBC (Windows/Linux/Mac)

    Available for Microsoft Windows, Unix, and Mac (macOS / OS X) platforms.

  • Certified ODBC Compatibility*

    Our drivers undergo extensive testing and are certified to be compatible with leading analytics and reporting applications like Tableau, Microsoft Excel, and many more.

    * Please visit our knowledge base to access how-to articles.
  • Embedded Remoting Capabilities

    Our exclusive Remoting feature allows hosting the ODBC connection on a server to enable connections from various clients on any platform (Java, .NET, C++, PHP, Python, etc.), using any standards based technology (ODBC, JDBC, etc.). ODBC Remoting is enabled using the popular MySQL and SQL (TDS) wire protocol server.

  • String, Date, Numeric SQL Functions

    The driver includes a library of 50 plus functions that can manipulate column values into the desired result. Popular examples include Regex, JSON, and XML processing functions.

  • Collaborative Query Processing

    Our drivers enhance the data source's capabilities by additional client-side processing, when needed, to enable analytic summaries of data such as SUM, AVG, MAX, MIN, etc.

  • Easily Customizable and Configurable

    The data model exposed by our ODBC Drivers can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. These customizations are supported at runtime using human-readable schema files that are easy to edit.

  • Enterprise-class Secure Connectivity

    Includes standard Enterprise-class security features such as TLS/ SSL data encryption for all client-server communications.

  • Replication and Caching

    Our replication and caching commands make it easy to copy data to local and cloud data stores such as Oracle, SQL Server, Google Cloud SQL, etc. The replication commands include many features that allow for intelligent incremental updates to cached data.

Enterprise-Class Remoting

MySQL/SQL Database entry points for Microsoft Project Data

The CData ODBC drivers include powerful fully-integrated remote access capabilities that makes Microsoft Project data accessible from virtually anywhere. The drivers include the CData SQL Gateway, which can the optional ability to accept incoming SQL and MySQL client connections and service standard database requests.

With the CData SQL Gateway, users can interact with Microsoft Project data from any client that supports SQL Server or MySQL: from Web & mobile applications, to CRM and CMS systems, BI tools like SQL Server Analysis Services, and even through popular management applications like MySQL Workbench. Access Microsoft Project data from virtually any application that can access external data. Applications that can access SQL Server or MySQL data can now connect to Microsoft Project with this driver.

  • Connect Microsoft Project data with popular BI tools like SQL Server Analysis Services.
  • Enable enterprise Microsoft Project data integration through SQL Linked Server connectivity
  • Includes support for the MySQL and SQL (TDS) remote access protocols, with advanced wire-protocol SSL security - industry standards for remote database connectivity.
  • Easily connect to Microsoft Project from code (PHP, Python, Ruby, Objective-C, etc.) using one of the standard client libraries for accessing SQL/MySQL.
  • * Available exclusively in ODBC Server Licenses.

learn more   

Frequently Asked Microsoft Project ODBC Driver Questions

Learn more about Microsoft Project ODBC drivers for data and analytics integration


Not natively. However, CData offers an ODBC driver for Microsoft Project that allows you to connect to Microsoft Project data from any ODBC-compliant application, just like you would access a traditional database. This can be useful for tasks like:

  • Accessing Microsoft Project from applications: Connect to Microsoft Project data in popular tools and applications including Microsoft Excel, Tableau, Power BI, and many others.
  • Real-time data: You can work with live Microsoft Project data within these applications, enabling tasks like reporting and analysis.
  • Connecting systems: Build data integrations between Microsoft Project and other systems.

The Microsoft Project ODBC driver is an ODBC 3.8 compliant native protocol-based driver with comprehensive ANSI SQL-92 support. This means that virtually any application that can connect to data via ODBC, can use the CData ODBC driver for real-time integration. Download a fully functional free trial of the Microsoft Project ODBC driver today to get started.

Yes, the CData ODBC driver for Microsoft Project provides universal ODBC data connectivity for Microsoft Project. The Microsoft Project ODBC driver offers a simple SQL-based layer of abstraction that simplifies real-time data access for users and applications, enabling them to communicate with Microsoft Project using a standardized set of functions. Virtually any application on any platform (including Windows, macOS, or *nix) can use the CData ODBC driver for real-time integration.

Connectivity to Microsoft Project via ODBC is easy. First, download and install the Microsoft Project ODBC driver. The download page includes separate installers for Windows, macOS, and Unix, so please select the Microsoft Project ODBC driver that matches the platform where you intend to use the driver.

Once the installation is complete, navigate to the ODBC driver documentation page. Here, you'll find a wealth of information about the installed driver. The step-by-step instructions for creating a DSN and using it to connect to Microsoft Project via ODBC are just the beginning. The documentation also provides extensive configuration details for using the Microsoft Project ODBC driver with all your favorite applications and development tools, ensuring you have all the support you need.

All of the CData ODBC drivers, including the Microsoft Project ODBC driver are available for download online. To get started, download a fully functional free trial of the Microsoft Project ODBC driver today.

To install the Microsoft Project driver, simply download one of the Microsoft Project ODBC driver installers available online. The download page includes separate Windows, macOS, and Unix installers, so please select the Microsoft Project ODBC driver that matches the platform where you intend to use the driver. The installers are comprehensive setup utilities that will install all the components required to use the Microsoft Project ODBC driver on your system.

The Microsoft Project ODBC driver is available in both 32-bit and 64-bit binaries. The Microsoft Project driver installer will allow you to install both options, and you can select the ODBC driver binary that is appropriate for the system where you intend to use the driver.

Absolutely. The Microsoft Project ODBC driver seamlessly supports pyODBC connectivity. For example, check out this article on our online knowledgebase that demonstrates how you can connect to Microsoft Project from PyCharm using pyODBC and the Microsoft Project ODBC driver.

However, besides ODBC support, we also provide native Python data connectivity for Microsoft Project. To learn more, check out the Microsoft Project Python Connector online.