Model Context Protocol (MCP) finally gives AI models a way to access the business data needed to make them really useful at work. CData MCP Servers have the depth and performance to make sure AI has access to all of the answers.
Try them now for free →Add Microsoft Project Connectivity to Tableau
A powerful set of certified data connectors that simplify the process of accessing enterprise data in real-time. Connect with Microsoft Project data from Tableau Deskop, Tableau Server, & Tableau Data Management solutions.

Full Metadata Discovery
Intelligent rowscan, type detection, relationship exploration and support for unstructured data.

Robust SQL-92 Engine
Rich SQL-92 engine with support for bulk operations, push-down, client functions, and aggregation

Unmatched Performance
Optimized performance down to the socket level, our drivers offer unmatched performance.

Enterprise-Class Security
Advanced Security and Authentication. Secure TLS / SSL data encryption.
Certified Tableau Connectivity
-
100% Certified Tableau Connectivity
Native Tableau Connectors seamlessly integrate with Tableau BI and Data Prep to enable real-time data connectivity with Microsoft Project.
-
Comprehensive Metadata Discovery
Extensive schema discovery capabilities for Microsoft Project. Explore tables, columns, keys, and other data constructs based on user identity.
-
Flexible NoSQL flattening
Easily connect Tableau directly with complex heirarchical data through flexible and extensible NoSQL flattening.
Learn more: Parsing Hierarchical Data
-
Blazing Data Connectivity
Our drivers push the boundaries of data access, optimizing socket-level streaming and compression capabilities, and delivering truly exceptional data access.
Learn more: Unmatched Performance
-
Easily Customizable and Configurable
The data model exposed by our Tableau Connectors can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. These customizations are supported at runtime using human-readable schema files that are easy to edit.
-
Enterprise-class Security
Includes standard Enterprise-class security features such as TLS/ SSL data encryption for all client-server communications.
Complex Query Processing
The CData Microsoft Project Connector contains an embedded SQL Engine that pushes supported SQL operations to the data source and processes unsupported operations client-side (Query Folding).
- Issue complex queries using SQL-92 compliant operations and clauses.
- Leverage server-side data processing for supported operations.
- Build new relationships and custom datasets.



High-Performance Data Delivery
Our Microsoft Project Tableau Connector is capable of delivering exceptional real-time data access. All of our Tableau Connectors are based on a highly-efficient query engine that has been optimized down to the socket level with streaming and compression capabilities.
- Enable real-time analytics through unmatched data processing.
- Request data as quickly as possible using server-side paging and bulk capabilities.
Popular Tableau Videos:

Download the Microsoft Project Connector
Building custom dashboards & reports that connect with live Microsoft Project data has never been easier. Download the CData Tableau Connector for MS Project now, and get connected.
Download Now