Access Live Microsoft Project Data in AWS Lambda



Connect to live Microsoft Project data in AWS Lambda using the CData JDBC Driver.

AWS Lambda is a compute service that lets you build applications that respond quickly to new information and events. AWS Lambda functions can work with live Microsoft Project data when paired with the CData JDBC Driver for MS Project. This article describes how to connect to and query Microsoft Project data from an AWS Lambda function built in Eclipse.

At the time this article was written (June 2022), Eclipse version 2019-12 and Java 8 were the highest versions supported by the AWS Toolkit for Eclipse.

With built-in optimized data processing, the CData JDBC Driver offers unmatched performance for interacting with live Microsoft Project data. When you issue complex SQL queries to Microsoft Project, the driver pushes supported SQL operations, like filters and aggregations, directly to Microsoft Project and utilizes the embedded SQL engine to process unsupported operations client-side (often SQL functions and JOIN operations). In addition, its built-in dynamic metadata querying allows you to work with and analyze Microsoft Project data using native data types.

Gather Connection Properties and Build a Connection String

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, you will need to specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

NOTE: To use the JDBC driver in an AWS Lambda function, you will need a license (full or trial) and a Runtime Key (RTK). For more information on obtaining this license (or a trial), contact our sales team.

Built-in Connection String Designer

For assistance constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Double-click the JAR file or execute the jar file from the command line.

java -jar cdata.jdbc.microsoftproject.jar

Fill in the connection properties (including the RTK) and copy the connection string to the clipboard.

Create an AWS Lambda Function

  1. Download the CData JDBC Driver for MS Project installer, unzip the package, and run the JAR file to install the driver.
  2. Create a new AWS Lambda Java Project in Eclipse using the AWS Toolkit for Eclipse. You can follow the tutorial from AWS (amazon.com).

    For this article, set the Input Type for the project to "Custom" so we can enter a table name as the input.

  3. Add the CData JDBC Driver for MS Project JAR file (cdata.jdbc.microsoftproject.jar) to the build path. The file is found in INSTALL_PATH\lib\.
  4. Add the following import statements to the Java class: import java.sql.Connection; import java.sql.DriverManager; import java.sql.ResultSet; import java.sql.ResultSetMetaData; import java.sql.SQLException; import java.sql.Statement;
  5. Replace the body of the handleRequest method with the code below. Be sure to fill in the connection string in the DriverManager.getConnection method call.

    String query = "SELECT * FROM " + input; try { Class.forName("cdata.jdbc.microsoftproject.MicrosoftProjectDriver"); } catch (ClassNotFoundException ex) { context.getLogger().log("Error: class not found"); } Connection connection = null; try { connection = DriverManager.getConnection("jdbc:cdata:microsoftproject:RTK=52465...;User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;"); } catch (SQLException ex) { context.getLogger().log("Error getting connection: " + ex.getMessage()); } catch (Exception ex) { context.getLogger().log("Error: " + ex.getMessage()); } if(connection != null) { context.getLogger().log("Connected Successfully!\n"); } ResultSet resultSet = null; try { //executing query Statement stmt = connection.createStatement(); resultSet = stmt.executeQuery(query); ResultSetMetaData metaData = resultSet.getMetaData(); int numCols = metaData.getColumnCount(); //printing the results while(resultSet.next()) { for(int i = 1; i <= numCols; i++) { System.out.printf("%-25s", (resultSet.getObject(i) != null) ? resultSet.getObject(i).toString().replaceAll("\n", "") : null ); } System.out.print("\n"); } } catch (SQLException ex) { System.out.println("SQL Exception: " + ex.getMessage()); } catch (Exception ex) { System.out.println("General exception: " + ex.getMessage()); } String output = "query: " + query + " complete"; return output;

Deploy and Run the Lambda Function

Once you build the function in Eclipse, you are ready to upload and run the function. In this article, the output is written to the AWS logs, but you can use this is a template to implement you own custom business logic to work with Microsoft Project data in AWS Lambda functions.

  1. Right-click the Package and select Amazon Web Services -> Upload function to AWS Lamba.
  2. Name the function, select an IAM role, and set the timeout value to a high enough value to ensure the function completes (depending on the result size of your query).
  3. Right-click the Package and select Amazon Web Services -> Run function on AWS Lambda and set the input to the name of the Microsoft Project object you wish to query (i.e. "Projects").
  4. After the job runs, you can view the output in the CloudWatch logs.

Free Trial & More Information

Download a free, 30-day trial of the CData JDBC Driver for MS Project and start working with your live Microsoft Project data in AWS Lambda. Reach out to our Support Team if you have any questions.

Ready to get started?

Download a free trial of the MS Project Driver to get started: