DataBind Controls to Microsoft Project データ in C++Builder

DataBind to Microsoft Project のデータ in C++Builder with standard components and controls.

最終更新日:2023-06-12

The CData ODBC Driver for Microsoft Project makes it easy to integrate connectivity to live Microsoft Project のデータ with standard data access components in C++Builder. This article shows how to create a simple visual component library (VCL) application in C++Builder that connects to Microsoft Project のデータ, executes queries, and displays the results in a grid. An additional section shows how to use FireDAC components to execute commands from code.

Create a Connection to Microsoft Project データ

If you have not already, first specify connection properties in an ODBC DSN (data source name). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs.

Authentication セクションのUser およびPassword プロパティを、有効なMicrosoft Project ユーザークレデンシャルに設定する 必要があります。加えて、URL を有効なMicrosoft Project サーバーの組織ルート、またはMicrosoft Project サービスのファイルに 指定する必要があります。

You can then follow the steps below to use the Data Explorer to create a FireDAC connection to Microsoft Project.

  1. In a new VCL Forms application, expand the FireDAC node in the Data Explorer.
  2. Right-click the ODBC Data Source node in the Data Explorer.
  3. Click Add New Connection.
  4. Enter a name for the connection.
  5. In the FireDAC Connection Editor that appears, set the DataSource property to the name of the ODBC DSN for Microsoft Project.

Create VCL Applications with Connectivity to Microsoft Project データ

Follow the procedure below to start querying Microsoft Project のデータ from a simple VCL application that displays the results of a query in a grid.

  1. Drop a TFDConnection component onto the form and set the following properties:

    • ConnectionDefName: Select the FireDAC connection to Microsoft Project.
    • Connected: Select True from the menu and, in the dialog that appears, enter your credentials.
  2. Drop a TFDQuery component onto the form and set the properties below:

    • Connection: Set this property to the TFDConnection component, if this component is not already specified.
    • SQL: Click the button in the SQL property and enter a query. For example:

      SELECT ProjectName, ProjectActualCost FROM Projects
    • Active: Set this property to true.
  3. Drop a TDataSource component onto the form and set the following property:

    • DataSet: In the menu for this property, select the name of the TFDQuery component.
  4. Drop a TDBGrid control onto the form and set the following property:

    • DataSource: Select the name of the TDataSource.
  5. Drop a TFDGUIxWaitCursor onto the form — this is required to avoid a run-time error.

Execute Commands to Microsoft Project with FireDAC Components

You can use the TFDConnection and TFQuery components to execute queries to Microsoft Project のデータ. This section provides msprojectspecific examples of executing queries with the TFQuery component.

Connect to Microsoft Project データ

To connect to the data source, set the Connected property of the TFDConnection component to true. You can set the same properties from code:

FDConnection1->ConnectionDefName = "CData Microsoft Project ODBC Source"; FDConnection1->Connected = true;

To connect the TFDQuery component to Microsoft Project のデータ, set the Connection property of the component. When a TFDQuery component is added at design time, its Connection property is automatically set to point to a TFDConnection on the form, as in the application above.

Create Parameterized Queries

To create a parameterized query, use the following syntax below:

FDQuery1->SQL->Text = "select * from Projects where projectname = :ProjectName"; FDQuery1->ParamByName("projectname")->AsString = "Tax Checker"; query->Open();

The example above binds a string-type input parameter by name and then opens the dataset that results.

Prepare the Statement

Preparing statements is costly in system resources and time. The connection must be active and open while a statement is prepared. By default, FireDAC prepares the query to avoid recompiling the same query over and over. To disable statement preparation, set ResourceOptions.DirectExecute to True; for example, when you need to execute a query only once.

Execute a Query

To execute a query that returns a result set, such as a select query, use the Open method. The Open method executes the query, returns the result set, and opens it. The Open method will return an error if the query does not produce a result set.

FDQuery1->SQL->Text := "select * from Projects where projectname = :ProjectName"; FDQuery1.ParamByName("projectname")->AsString = "Tax Checker"; FDQuery1->Open();

To execute a query that does not return a result set, use the ExecSQL method. The ExecSQL method will return an error if the query returns a result set. To retrieve the count of affected rows use the TFD.RowsAffected property.

FDQ.SQL.Text := "delete from Projects where Id = :Id"; FDQuery1->Params->Items[0]->AsString = "x12345"; FDQuery1->ExecSQL(); AnsiString i = FDQuery1->RowsAffected;

Related Articles

Below you can find other articles for using the CData ODBC Driver with RAD Studio, Delphi, and C++ Builder.

関連コンテンツ

トライアル・お問い合わせ

30日間無償トライアルで、CData のリアルタイムデータ連携をフルにお試しいただけます。記事や製品についてのご質問があればお気軽にお問い合わせください。